1. Establish applicability
Identify the program requirements, product and process scope, customer expectations and decision authority. Record what is applicable and what still needs clarification.
KNOWLEDGE · AUTOMOTIVE → AEROSPACE
Moving from Automotive APQP into an aerospace program? Start by asking what your existing work proves, where it applies, and how its engineering evidence connects.
Start the free transition diagnostic →START WITH WHAT YOU HAVE
An existing FMEA, Control Plan or PPAP package can be a valuable asset. Its title alone does not establish whether it addresses the scope, revisions, evidence and approval needs of the new program. Review one representative characteristic through the work before judging the whole package.
Identify the program requirements, product and process scope, customer expectations and decision authority. Record what is applicable and what still needs clarification.
Trace the selected characteristic through risk analysis, process controls, measurement and supporting records. Look for inconsistent identifiers, revisions or assumptions at each handoff.
Separate an absent record from incomplete content, weak evidence, a broken connection or an unresolved approval. Each needs a different follow-up action.
A PRACTICAL TRANSITION LENS
Retain an existing asset when its applicability and supporting evidence have been reviewed.
Check assumptions, scope or evidence before deciding whether reuse is justified.
Extend or reconnect work that needs program-specific content, validation or approval.
Create missing applicable deliverables or evidence and define how completion will be verified.
The Navigator uses an engineering evidence chain as a review framework:
Requirements / Risk → DRA → CI/KC → Design Record → PFD → PFMEA / Process KC → Control Plan → MSA → Capability → FAIR → PPAP → Approval / Disposition
This is a navigation framework, not a universal mandated sequence. Determine applicability and the required review depth for your program.
DRA: Design Risk Analysis; CI/KC: Critical Items / Key Characteristics; PFD: Process Flow Diagram; PFMEA: Process Failure Mode and Effects Analysis; MSA: Measurement System Analysis; FAIR: First Article Inspection Report; PPAP: Production Part Approval Process.
A supplier has a PFMEA and a Control Plan, but the same characteristic has different identifiers in the measurement record. Before accepting reuse, identify the intended connection, reconcile the records and verify the resulting evidence. A completed document count would miss this issue.
Independent practical guidance, not a conformity determination or customer approval. Use authorized standards and the requirements applicable to your program. Not affiliated with or endorsed by SAE International or AIAG.
NEXT · DIAGNOSTIC
Use six screening questions to identify review priorities. No account or project upload required.
Run the free diagnostic →Already know your gaps? Explore the Professional Work System →
Get email updates from AeroQuality Insight.